PHASE II: SYSTEM INSTALLATION

Once the Conference Room Pilot system is accepted the System Installation phase begins, during which the product is installed at our customer's site. Consisting of five events, the System Installation Phase begins with a clearly defined plan that outlines all installation and testing guidelines. Once a Cut-Over plan is defined by our customer, the installation will progress until the system is fully operational and stable within customer's site.

Preliminary Installation| On-Site Training| Full System Installation| Parallel Testing| System Cut-Over

EVENT ONE: PRELIMINARY INSTALLATION

During the Preliminary Installation phase, all necessary hardware and third party software is installed and tested by our customer. Communications is then established between the host and the ScanData system.

This event includes:

bullet

Cut-Over Plan Defined and Accepted Our customer's specifications detailing how the ScanData system will be integrated into their facility are reviewed and accepted.

bullet

Installation and Configuration of Third Party Hardware and Software All third-party hardware is installed and configured by our customer.

bullet

Preliminary Operational On-Site Testing Our customer tests the functionality of all third-party hardware and third-party software installed at their facility in order to ensure that all parts are functioning properly.

bullet

Establish On-Site Communications ScanData and our customers work jointly to link the host system to the ScanData server so that data can be passed between the two.

bullet

On-Site Communications Testing ScanData and our customers jointly test the communications linkage between the ScanData Server and the host system in order to ensure that information is successfully passed from server to server.

bullet

Initial Installation of ScanData Software All ScanData software accepted by our customer during the Conference Room Pilot is installed and tested by ScanData engineers.

[Top]


EVENT TWO: ON-SITE TRAINING

In preparation for Parallel Testing and Live System Use, ScanData personnel are available to perform and/or support user training up to the point of Live System Use.

This event includes the following:

bullet

Operational Consultation Training ScanData personnel assist and consult our customer's trainer(s) in the training of end users.

bullet

User Documentation ScanData provides user documentation to our customers for use in training. This documentation will include user manuals, quick reference sheets, and training check off forms.

[Top]


EVENT THREE: FULL SYSTEM INSTALLATION

Any ScanData components not implemented during the Preliminary Installation stage are installed, reviewed, and tested with our customers at their facility.

This event includes:

bullet

Final Operational On-Site Stress Testing-Our customers conduct all final operational testing of the entire system using business data derived from that production environment. Upon request, ScanData assists  with any modifications to the test plan. Our customers and ScanData verify that the system is fully functional through a series of Live System tests.

[Top]


EVENT FOUR: PARALLEL TESTING

ScanData provides up to one full week (five days) of parallel testing at our customers' facilities with one person (an administrator or trainer) for eight hours of every day in order to process packages under all possible conditions.

This event includes:

bullet

Parallel Testing Our customer's tester(s) will process as many orders and packages as possible through the ScanData system, mimicking the orders passing through any previously existing system in order to make informed comparisons and stress-test the software.

bullet

Parallel Testing Review and Acceptance Testers keep a daily log of the items processed through the ScanData system as well as any issues encountered while performing the Parallel Test. This log will be transmitted to ScanData on a daily basis in order to ensure that proper testing is occurring. Prior to Live System Use, ScanData will assess the quality of the testing and make recommendations accordingly.

[Top]


EVENT FIVE: SYSTEM CUT-OVER

Live System Use begins on the day that our customer either accepts the system or begins to use all or substantially all ScanData applications for daily business. Once Live System Use occurs, the System Warranty phase begins.

This event includes:

bullet

System Cut-Over — The fully installed product begins full operation within our customer's environment. Based upon the Cut-Over plan provided by our customer, any previously existing system is operationally replaced, and any final testing can begin.

[Top]

Home | Up | Solutions | Services | Prices | Customers | News | Careers | Contact Us | FAQ's | Search

Send mail to raworkman@scandata.com with questions or comments about this web site.
Copyright © 2006 ScanData Systems
Last modified: 07/05/06